Jobs
WIP, variance, and overhead.
Track WIP per job and post variance against standard costs at completion. BOM and work orders drive material and labor posting; labor flows from approved timesheets.
- Job costing with WIP tracking.
- Standard costs and variance analysis.
- Bill of materials and work orders.
- Material, labor, overhead variance reports.
- Plantwide, departmental, or ABC overhead allocation.
