Cost

All plans

Job costing, standard costs, and overhead allocation.

Job costing with WIP tracking. Standard costs with variance analysis. Bill of materials and work orders. Plantwide, departmental, and activity-based overhead allocation. Labor cost posting from approved timesheets.

Cost accounting on the floor

Jobs

01

WIP, variance, and overhead.

Track WIP per job and post variance against standard costs at completion. BOM and work orders drive material and labor posting; labor flows from approved timesheets.

  • Job costing with WIP tracking.
  • Standard costs and variance analysis.
  • Bill of materials and work orders.
  • Material, labor, overhead variance reports.
  • Plantwide, departmental, or ABC overhead allocation.

Why Quoining

02

Job costing as a first-class ledger dimension.

Job-cost modules in legacy suites are priced and implemented like separate products. Quoining treats jobs as native dimensions, so cost rolls up live from the entries themselves.

  • Job-level P&L from actual postings, not allocations after the fact.
  • Variance reporting against estimates as work progresses.
  • Labor, materials, and overhead land on jobs at posting time.

Want a closer look?

See cost accounting in a guided demo.

Walk through the workflow with our team. We'll show how it fits your books and answer questions on plan fit, migration, and rollout.

Questions

About cost accounting.

Which plan includes cost accounting?

Every plan, including Essentials. Cost accounting is part of the base feature set.

Ready to put cost accounting to work?

Start a free account in minutes, see the plan that fits, or book a guided demo with our team.